GBS Zero

GBS Zero

zondag 15 juli 2012

Seat back panel

Al lot of work is done to fitted this panel. Drill 60 holes apply the kit on the frame and then riveting the back panel.



Left rear suspension

Almost ready the rear site. Next month starting with the brakelines and brakes.