GBS Zero

GBS Zero

maandag 2 december 2013

VDO Fuel sender with adapter plate

Finally the adapterplate is finished to mount the fuel sender. The adapter plate is needed because the orignal hole made by GBS is based on the Smiths fuel sender. The VDO fuel sender is smaller.

 



maandag 3 juni 2013

First part of the engine build almost finished

Sump and oil pickup pipe installed. Next project: the sensors and temperature house and after that attach the gearbox to the engine.



maandag 13 mei 2013

zaterdag 4 mei 2013

Stainless steel sump ready






                                       

                                       

maandag 4 februari 2013

New diff and seats

Nice seats and a new diff 3.92 instead of the 3.64.



Prepare Gearbox and Engine

We are now preparing the gearbox and the engine for install.

New seals for the gearbox also new clutchbearing and MT75 GBS Zero pin. (See pict 2)