Here you can keep up to date with all the news about my project to build a GBS zero.
GBS Zero
dinsdag 17 april 2012
maandag 16 april 2012
zaterdag 7 april 2012
Starting with the rear end.
Rear end of the Sierra almost stripped. Next thing is de differential and axles and then starting with the front.
zondag 1 april 2012
The donor car arrived...starting to strip her...
Which parts do I need:
- Front uprights and front brake assambly
- Upper steering column with switches, cowling and ignition barrel
- Steering box
- Hand brake lever
- Differential
- Drive shafts and hub assembly
- Rear disc brakes
- Gearbox (MT75)
- Front uprights and front brake assambly
- Upper steering column with switches, cowling and ignition barrel
- Steering box
- Hand brake lever
- Differential
- Drive shafts and hub assembly
- Rear disc brakes
- Gearbox (MT75)
maandag 26 maart 2012
Preparing the garage
Cleaning up the garage. After the demilition of the donor car the garagefloor must be painted before the GBS arrived.
Donor car
Upcoming Saturday to Limburg to get the donor car a Ford Sierra GLS.
When we got home we are going to immediately start scrapping the car.
When we got home we are going to immediately start scrapping the car.
Abonneren op:
Posts (Atom)
